Tracker & mounting structure installation

Single-axis trackers and fixed-tilt systems assembled accurately, quickly and exactly to the manufacturer's installation manual.

The structure is the backbone of every solar array. Small errors in post position or alignment multiply across thousands of tables, causing module stress, clamp problems and tracker faults later on. Our crews assemble structures with the precision that utility-scale plants demand.

Our site manager has delivered more than 800 MW of solar capacity, so our teams are familiar with the installation logic of the main tracker and fixed-tilt systems used in Europe and the UK.

What we deliver

  • Post positioning and alignment checks before assembly
  • Single-axis tracker assembly: torque tubes, bearings, drive and damper components
  • Fixed-tilt table assembly: rafters, purlins and bracing
  • Assembly strictly to project drawings and manufacturer requirements
  • Torquing and torque marking of every structural fixing

How we protect quality

Each completed row is checked against drawings for alignment and fixing completeness before modules go on. Quality Control is a separate role reporting to the site manager, and torque is verified with a digital torque wrench.

Common questions

Which tracker systems have you worked with?

Our team has installed both single-axis trackers and fixed-tilt systems on utility-scale projects. Tell us which system your project uses and we will confirm our experience and any manufacturer training requirements.