Helios Build Ltd

PV module installation

Fast, careful module installation with correct alignment, spacing and clamp placement across every array.

Modules are the most valuable component on site — and the easiest to damage. Micro-cracks from poor handling or incorrect clamping can reduce yield for decades. Our crews handle, place and fix modules with the care the manufacturer's warranty requires.

With an indicative output of 25–30 MW per month including torquing and marking, we keep pace with demanding programmes without cutting corners.

What we deliver

  • Unpacking and distribution of modules along the rows
  • Module handling in line with manufacturer guidance
  • Placement with correct alignment and spacing
  • Clamp positioning within the manufacturer's permitted zones
  • Torquing and torque marking of module clamps

How we protect quality

Alignment, spacing and clamp placement are checked row by row. Every clamp is tightened to the specified torque with controlled tools and marked, so inspectors can verify completed work at a glance.

Common questions

How many MW of modules can you install per month?

Indicatively 25–30 MW per month of structure and module installation with our current crew. Output depends on site conditions, structure complexity and clamp type, and the crew can be scaled.

Do you handle bifacial and large-format modules?

Yes — large-format and bifacial modules are standard on modern utility-scale projects. We follow the manufacturer's handling and clamping instructions for the specific module on your project.

Planning a solar build? Lock in an experienced crew early.

Tell us the size, location and programme — we reply within one working day with crew size, output and availability.