Combining mechanical and selected electrical works in one crew reduces interfaces and keeps the programme moving. As soon as modules are fixed, our teams connect strings and dress cables so arrays are ready for the electrical contractor's testing and terminations.
Neat, well-secured cabling is not just cosmetic — loose cables chafe, sag and fail. We follow the project cable routing drawings and manufacturer requirements.
What we deliver
- Cable pulling
- Module-to-module (string) connections
- Cable dressing and cable management with ties and clips
- Basic cable terminations
How we protect quality
Connector engagement and cable fixing are checked as each row is completed. Cable routing follows project drawings to avoid sharp edges and moving tracker parts.
Common questions
Do you carry out HV or substation works?
No. Our electrical scope covers cable pulling, module-to-module connections, cable management and basic terminations. We coordinate with your electrical contractor for testing, inverter and HV works.
Can electrical works run in parallel with module installation?
Yes. Our teams can follow directly behind module installation, so strings are connected and dressed as rows are completed.