Solar farm installation in Scotland
Our head office is in Glasgow, so Scottish projects benefit from short mobilisation and a team that knows local site conditions — wind exposure, wet ground and short winter days that demand careful daily planning.

Based in Glasgow, we mobilise experienced solar installation crews to utility-scale projects anywhere in the United Kingdom.
Coverage
Britain's solar pipeline is spread across every nation — from large ground-mount schemes in England to fast-growing portfolios in Scotland, Wales and Northern Ireland. Our crews travel to wherever the project is and work under the principal contractor's site rules, with the same supervision, tooling and quality control on every site.
Our head office is in Glasgow, so Scottish projects benefit from short mobilisation and a team that knows local site conditions — wind exposure, wet ground and short winter days that demand careful daily planning.
England hosts the majority of the UK's utility-scale solar pipeline. We support EPC contractors on large ground-mounted and tracker projects, scaling the crew to match demanding programmes.
From South Wales to Anglesey, we provide mechanical installation crews for structure assembly, module installation and torque QA on Welsh solar farms.
We mobilise to Northern Ireland projects as a complete, self-sufficient team — site manager, supervisor, quality control, foremen and operatives with their own tools.
Scope of work

Accurate positioning, alignment and installation depth to approved drawings — the foundation of a stable mounting structure.
Learn more →
Single-axis trackers and fixed-tilt systems. Post positioning, alignment and assembly strictly to project drawings and manufacturer requirements.
Learn more →
Careful handling and fast placement with correct alignment, spacing and clamp position across every array.
Learn more →
Tell us the site location, capacity and programme. We confirm crew size, output and start date, then arrive fully tooled under one accountable site manager.

Programme estimator
Indicative figures for structure and module installation including torquing and marking, based on our typical output of 5–6 MW per team per month.
Indicative only. Actual output depends on site conditions, structure complexity and module clamp type. We confirm figures after reviewing drawings.