Solar farm installation services
We focus on the mechanical and selected electrical scope of ground-mounted solar PV — and we do it fast, to drawings and with documented quality control.
Where we fit in your project
Mechanical & electrical installation for ground-mounted solar PV
We work as a specialist installation subcontractor to EPC contractors, principal contractors and developers. You provide the materials, drawings and site access; we provide supervised, fully tooled crews that turn deliveries into inspection-ready arrays.

Pile driving
Accurate positioning, alignment and installation depth to approved drawings — the foundation of a stable mounting structure.
Learn more →
Structure assembly
Single-axis trackers and fixed-tilt systems. Post positioning, alignment and assembly strictly to project drawings and manufacturer requirements.
Learn more →
PV module installation
Careful handling and fast placement with correct alignment, spacing and clamp position across every array.
Learn more →
Selected electrical works
- Cable pulling
- Module-to-module connections
- Cable dressing & cable management
- Basic cable terminations
Why EPCs choose us
Built to remove risk from your programme
Predictable output
Indicative 25–30 MW per month of structure and module installation, including torquing and marking. We plan against your site conditions, structure type and clamp system — no surprises.
Dedicated quality control
QC is a separate function reporting directly to the site manager — not a foreman checking his own work. Joints are verified with digital torque wrenches.
Scalable, compliant crews
30 operatives today in 5 organised teams, scaled to your programme. Every worker is legally resident in the UK and authorised to work.
Fully tooled
Crews arrive with every tool needed for the scope, including Milwaukee ONE-KEY digital torque tools and two skid steer operators.
How we work
From mobilisation to inspection-ready arrays
- 1
Scope & drawings review
We review project drawings, structure type and manufacturer requirements, then confirm crew size and monthly output.
- 2
Mobilisation
Teams of a foreman plus four operatives arrive fully tooled, under one site manager and supervisor.
- 3
Installation
Structure assembly, module placement and electrical works carried out in sequence to keep the programme moving.
- 4
Torque, mark & QC
Every fixing torqued and marked; QC verifies joints with digital torque wrenches before handover.
Programme estimator
Estimate your installation programme
Indicative figures for structure and module installation including torquing and marking, based on our typical output of 5–6 MW per team per month.
Indicative only. Actual output depends on site conditions, structure complexity and module clamp type. We confirm figures after reviewing drawings.
Get a confirmed programme →Planning a solar build? Lock in an experienced crew early.
Tell us the size, location and programme — we reply within one working day with crew size, output and availability.